DAVAO CITY (MindaNews / Could 7) — The three-story rectory of the San Ignacio de Loyola Parish in Manay, Davao Oriental, which was severely broken by the “doublet quake” in October final yr, will quickly be demolished, a parish official confirmed Thursday.
In a message to MindaNews, parish coordinator Berogene V. Padada stated demolition works will start as soon as the required paperwork are accomplished and gas costs decline amid the continued disaster.
“Not now as a result of crude oil continues to be costly. As soon as costs go down, that’s once we can begin the demolition,” he stated within the vernacular. He added that demolition tools from the provincial authorities is already ready.
Within the morning of October 10 final yr, a magnitude 7.4 earthquake struck off the coast of the municipality of Manay. A whole bunch of aftershocks have been recorded that day, however a magnitude 6.8 quake within the early night stood out.
The choice to demolish the rectory got here after engineers convened on January 30 on the Clergy Home in Mati Metropolis to debate whether or not the construction might nonetheless be retrofitted or if demolition was the safer possibility.
Engr. Prisco Jr. F. Balaba, officer-in-charge of the Municipal Engineering Workplace (MEO), advisable in January the demolition of the constructing as a result of the rectory has remained unsafe for occupancy for the reason that October 10 earthquakes.
“If we retrofit the rectory, it’s an enormous labor. It’s like reconstructing as a result of there’s a main structural injury,” he stated.
The constructing, constructed via bayanihan beginning in October 2020, has been cordoned off for the reason that second week of April, signaling that demolition might start quickly.
Though nonetheless unfinished, the constructing has been utilized by the parish for conferences, choir practices, and non permanent lodging for visiting church staff. The parish had deliberate to finish the constructing however the October earthquakes halted building.
With the parish set to have fun its fiesta on Could 16, Padada stated a presbyterium assembly is scheduled on Could 12, the place church officers are anticipated to finalize the demolition timetable.
Padada admitted that many parishioners have been saddened by the choice.
“Many felt disheartened and regretful as a result of what had been constructed via years of sacrifice would finally be misplaced,” he added.
Parishioner Rose Caumanday, a resident of Barangay Guza, stated in an interview in January that she remembers serving to carry building supplies and making ready meals for the employees.
“All of us wished to see it completed,” Caumanday stated in vernacular.
The rectory reportedly value round ₱13 to ₱15 million to construct, funded via contributions from parishioners and donors.
Late Wednesday night, the province was once more shaken by a magnitude 5.9 earthquake. Regardless of the tremor, Padada stated the constructing stays intact.
“The plan is to clear the realm so it is going to be safer in case one other earthquake strikes,” he stated. (Division EJ Teman / MindaNews)
https://weblog.passive-income4u.com/create-your-very-own-auto-publish-news-blog-site-and-earn-passive-income-in-just-4-easy-steps/
https://mindanews.com/top-stories/2026/05/davao-oriental-rectory-damaged-by-quakes-to-be-demolished/



