CAGAYAN DE ORO CITY(MindaNews/11 July 2026)— Heavy monsoon rains pressured engineers and personnel from the Division of Public Works and Highways Area 10 (DPWH-10) to droop clearing operations alongside the San Fernando–Talaingod Freeway on Friday, 10 July.
DPWH-10 Public Affairs Officer-in-Cost Jaymaica Maraguinot mentioned one other landslide pressured engineers and personnel to droop operations attributable to security fears, as they have been clearing an estimated 80,000 cubic meters of mud and particles that buried two-thirds of the freeway growth.
“They needed to cease clearing operations because of the hazards of falling timber and dust when the landslide occurred round 8 a.m. on Friday,” Maraguinot instructed MindaNews over the telephone.
Maraguinot mentioned DPWH personnel will resume clearing operations as soon as the climate improves. Within the meantime, she suggested motorists to take the Bukidnon–Davao Street (Buda) in Quezon, Bukidnon, as a substitute route.
On Wednesday, heavy rains introduced by the improved southwest monsoon triggered a large landslide that buried a four-lane freeway growth in Sitio Balacayo, Barangay Kalagangan, San Fernando, Bukidnon.
The freeway growth venture is designed to enhance vehicular site visitors between San Fernando, Bukidnon and Talaingod, Davao del Norte. (Froilan Gallardo/MindaNews)
https://weblog.passive-income4u.com/create-your-very-own-auto-publish-news-blog-site-and-earn-passive-income-in-just-4-easy-steps/
https://mindanews.com/top-stories/2026/07/san-fernando-talaingod-road-remains-closed-as-dpwh-suspends-clearing-operations/



