GLAN, Sarangani (MindaNews / 19 June 2026) – The soccer discipline of an area college has been utilized as a discipline hospital after the 30-bed capability Municipal Hospital was declared a red-tagged construction following the Magnitude 7.8 earthquake that rocked Maasim city on June 8.
A red-tagged construction means one that’s already too harmful to inhabit as a result of extreme injury.
The choice by the Municipal Well being Workplace (MHO) to maneuver all sufferers and most amenities of the Municipal Hospital to the sector hospital adopted post-disaster assessments.
However the momentary facility positioned on the soccer discipline of the Glan College of Arts and Trades in Barangay E. Alegado is on the mercy of parts.
Engr. Elnar Watin, head of engineering and upkeep on the MHO, stated the sufferers had been uncovered to temperatures reaching above 35 levels prior to now days.

When it rains, the sufferers might not be as totally protected by shelter tents supplied by the Division of Social Welfare and Improvement.
The power is continuous a lot of the outpatient providers.
The service is sort of al-fresco, a breeze blowing as a substitute of an anti-septic hospital air.
For the extra crucial instances, the hospital has no selection however to refer them to extra succesful amenities in close by areas.
The sphere hospital additionally runs a surgical facility operated by the Cotabato Regional and Medical Middle.
Nevertheless, not all is nicely, because the employees is on the mercy of the aftershocks, too.
Over 8,300 aftershocks have been recorded as of Friday, in keeping with the Philippine Institute of Volcanology and Seismology. The magnitudes ranged from 1.2 to six.4 with 90 reported as felt.
Staffers right here joked that the quakes didn’t enable them to “Duck, Cowl, and Maintain” however to “Cease, Drop, or Roll” as a substitute; one couldn’t stay standing throughout the tremors.
“We’re simply apprehensive in regards to the wellbeing of our employees,” Richelin Deyaya, chief nurse, informed MindaNews.
The hospital has a rotating employees of 273, together with 20 docs, at the very least 60 nursing employees, and 30 upkeep personnel.
Some staffers had been additionally always hoping for assist or assist coming from the federal government.
“Keep in mind that a few of them have properties that had been affected by the quake, too,” Deyaya stated.
Requested which precedence amenities the sector hospital wants, each Watin and Deyaya stated they hope assist would come to help sufferers beat the warmth.
Watin has a wishlist: window-type 2HP air conditioners, a provide of THHN wires starting from 3.5mm, 5.5mm., and eight.0mm electrical wires, and quite a lot of electrical tape.
For now, the engineering groups are making do with present energy connections from the college.
The sphere hospital would additionally have to prioritize the upkeep of its X-ray machine and surgical amenities, which would wish air-conditioning to verify the sufferers get the perfect care.
Locals stated energy was out in far-flung areas for nearly per week.
In the meantime, the MHO employees right here is making ready for the pullout of the groups supplementing their personnel by the tip of June. (Yas Ocampo/MindaNews)
https://weblog.passive-income4u.com/create-your-very-own-auto-publish-news-blog-site-and-earn-passive-income-in-just-4-easy-steps/
https://mindanews.com/top-stories/2026/06/football-field-serves-as-temporary-hospital-in-glan-after-quake/



